Cost Codes (Phase Codes)
Visual Mapping
Common Errors and FAQs
What Info-Link Tables do I need?
The following Info-Link tables are required when syncing Cost Codes from or to Spectrum:
- JC_STD_PHASE_DESCRIPTION_MC
- JC_PHASE_MASTER_MC
For details on enabling Info-Link tables for your user, see Steps 2.7 in our Spectrum authentication guide.
Tiering
If you would like to enable tiering in your Cost Code structure in Procore, let your Agave Account Manager know and we can configure this for you in your sync!
Agave can support up to 2 tiers, split in a format of your choosing. The character lengths of each tier must be consistent across projects.