Skip to main content

Company Cost Codes

Agave Sync allows you to link Company-level Cost Codes between Foundation and Procore.

Linking Company-level Cost Codes between Foundation and Procore is useful when the codes in each system don’t exactly match.

For example, in the visual mapping below, the Cost Code 10300 in Foundation is linked to 10300-100 in Procore. Even though these codes are not identical, linking allows them to be treated as equivalent, ensuring accurate data sync between systems.

Visual Mapping

Foundation and Procore Visual Mapping

Video Tutorials